NVE has had a long cooperation with Tanzania within hydrology, hydropower and electrification, through the Rural Energy Agency, the Energy and Water Utilities Regulatory Authority, the Regional Electricity Regulators Association and Tanzania Electricity Supply Company Ltd (TANESCO).
Client: Tanzania Electricity Supply Company Ltd – TANESCO.
NVE Mandate: Assisting TANESCO in the preparation of Programme Document for Operation and Maintenance (O&M) of Hydropower Plants in Tanzania.
Contract Value/ Duration: MNOK 1.4 for preparation of Programme Document (PD), including Terms of Reference (TOR). The project started in late 2009.
Type of Activities: Feasibility Study presentation at a workshop. Assisting TANESCO on PD preparation, including TOR for the “Capacity Building Implementer” (CBI). Assisting TANESCO during procurement of the CBI.
Work Completed 2010: Preparatory studies and project design for the O&M project with related components; feasibility study, PD and TOR
Activities and Outputs:The work specifically related to the planned O&M project can be summarized in three points: i) Workshop on feasibility report, conducted in Bagamoyo, June 2010. ii) Project document (PD) prepared in cooperation with TANESCO and finally submitted to the Norwegian Embassy, Dar es Salaam in December, 2010. iii) Draft TOR elaborated in cooperation with TANESCO.
A NVE team of three senior advisors visited Tanzania in June 2010 in order to present the feasibility report and to organise the workshop in Bagamoyo in cooperation with TANESCO. Site visits to three power plants and a training site were included. TANESCO contributed with inputs and comments to the report and arranged the fieldtrip.
A NVE team of two senior advisors participated in the African Hydro Symposium, at Arusha, September 2010. Several meetings were held with TANESCO officials and the Norwegian Embassy, and site visits to the remaining three power plants were completed on the way to Arusha. The team presented and discussed the PD with TANESCO and the final PD was finalized in November 2010.
Results/Outcome:The PD was developed as a joint effort on consensus basis with TANESCO and delivered to the Norwegian Embassy for further consideration. The TOR have similarly been prepared in order to develop options for a ROT (Rehabilitate-Operate-Transfer) or Twinning Partnership with TANESCO.
Such options need to be studied in sufficient detail to enable a decision on how to proceed in a timeand cost-effective way as dictated by the state of the infrastructure.